SEJ
Published on SEJ (https://www.sej.org)

Home > "Pilgrim No. 1 in U.S. for Shutdowns"

"Pilgrim No. 1 in U.S. for Shutdowns" [1]

"PLYMOUTH — From broken water pumps, leaky valves and steaming pipes to elusive electrical problems, it's been a tough year for Pilgrim Nuclear Power Station."



"Entergy, Pilgrim's owner and operator, has poured $500 million into the 41-year-old plant since buying it from Boston Edison in 1999, yet mechanical problems and off-site power outages have forced the operation to shut down six times since January, making it No. 1 among the U.S. fleet of 100 commercial nuclear reactors for shutdowns this year.

Pilgrim has spent 79 days in shutdown since January, although company officials are quick to attribute 46 of those to planned refueling last spring."

Christine Legere reports for the Cape Cod Times October 27, 2013. [2]
 

Energy & Fuel [3]
Nuclear Power & Radiation [4]
National (U.S.) [5]
Public [6]
Source: Cape Cod Times [2], 10/28/2013
  • Contact Us  |
  • Donate  |
  • Join  |
  • Members  |
  • Privacy & Security Policies  |
  • Reach SEJ Members  |
  • Renew  |
  • Site Map
The Society of Environmental Journalists
1629 K Street NW, Suite 300, Washington, DC 20006
Telephone: (202) 558-2055
Email: sej@sej.org
© 2026 The Society of Environmental Journalists. All Rights Reserved.
All graphics © SEJ, unless otherwise stated.

Source URL:https://www.sej.org/headlines/pilgrim-no-1-us-shutdowns

Links
[1] https://www.sej.org/headlines/pilgrim-no-1-us-shutdowns [2] http://www.capecodonline.com/apps/pbcs.dll/article?AID=/20131027/NEWS/310270335/-1/news11 [3] https://www.sej.org/category/topics-beat/energy [4] https://www.sej.org/category/topics-beat/nuclear-power/radiation [5] https://www.sej.org/category/region/national [6] https://www.sej.org/taxonomy/term/81