Cost To Fix Crystal River Nuclear Plant Could Hit $3.43B, Take 8 Years [1]
"Fixing the botched repairs at the Crystal River nuclear plant north of Tampa Bay could cost nearly $3.5 billion and take eight years, in a worst-case scenario."
"Fixing the botched repairs at the Crystal River nuclear plant north of Tampa Bay could cost nearly $3.5 billion and take eight years, in a worst-case scenario."
"MONTPELIER, Vt. -- Nearly 20 years after the Vermont and Texas Legislatures first agreed to have Vermont ship low-level radioactive waste to the Lone Star State, the first shipments of waste have been made."
"OMAHA, Neb. -- A Nebraska environmental group wants federal regulators to keep the Fort Calhoun nuclear plant shut down because it would be inundated by floodwaters in the unlikely event of a dam failing upstream."
"The Clean Nebraska group said Wednesday that the Nuclear Regulatory Commission's own assessment of the flood threat at the plant about 20 miles north of Omaha predicts all major equipment at Fort Calhoun would be flooded if the Oahe dam on the Missouri River failed.
"RALEIGH, N.C. -- A nuclear power partnership of General Electric Co. and Tokyo-based Hitachi Ltd. received federal approval Tuesday to build the first plant to enrich uranium for use in commercial reactors using a classified laser technology."
The political and public relations artifact that is the "nuclear renaissance" may be slowed by the industry's and the government's inability to deal with nuclear waste.
"Three Mile Island plant, scene of the worst nuclear power accident in the US, shut down automatically after failure of a coolant pump. Officials say the Three Mile Island shutdown poses no threat."
"Rising seawater temperatures forced an unprecedented shutdown last month of a nuclear reactor on the Connecticut coast."
"TOKYO -- The Japanese government has decided to phase out nuclear power by sometime in the 2030s and shift the country in the direction of renewables, energy conservation and natural gas."
"In a letter submitted Friday afternoon to internal investigators at the Nuclear Regulatory Commission, a whistleblower engineer within the agency accused regulators of deliberately covering up information relating to the vulnerability of U.S. nuclear power facilities that sit downstream from large dams and reservoirs."
"The letter also accuses the agency of failing to act to correct these vulnerabilities despite being aware of the risks for years.
"After Edison submits a plan to restart one reactor at San Onofre, the Nuclear Regulatory Commission is expected to take months to review it."
Links
[1] https://www.sej.org/headlines/cost-fix-crystal-river-nuclear-plant-could-hit-343b-take-8-years
[2] https://www.sej.org/category/topics-beat/nuclear-power/radiation
[3] https://www.sej.org/taxonomy/term/81
[4] https://www.sej.org/category/region/national/southeast
[5] http://www.tampabay.com/news/business/energy/cost-to-fix-crystal-river-nuclear-plant-could-hit-343-billion-take-eight/1254301
[6] https://www.sej.org/headlines/vt-begins-shipping-radioactive-waste-texas
[7] https://www.sej.org/category/topics-beat/waste
[8] https://www.sej.org/category/region/national
[9] http://www.sfgate.com/news/article/Vt-begins-shipping-radioactive-waste-to-Texas-3896009.php
[10] https://www.sej.org/headlines/fort-calhoun-nebraska-nuclear-plant-should-remain-closed-enviros
[11] https://www.sej.org/category/topics-beat/disaster
[12] https://www.sej.org/category/region/national/great-plains
[13] http://www.huffingtonpost.com/2012/09/26/fort-calhoun-nebraska-nuclear-plant_n_1916416.html?utm_hp_ref=green
[14] https://www.sej.org/headlines/us-panel-approves-nc-uranium-enrichment-plant
[15] http://www.beaumontenterprise.com/news/article/US-panel-approves-NC-uranium-enrichment-plant-3893217.php
[16] https://www.sej.org/headlines/nuclear-industry-slowed-its-own-waste
[17] http://www.ajc.com/news/business/nuclear-industry-slowed-by-its-own-waste/nSHx9/
[18] https://www.sej.org/headlines/three-mile-island-nuclear-plant-shuts-down-unexpectedly
[19] https://www.sej.org/category/region/national/mid-atlantic
[20] http://www.csmonitor.com/Environment/Latest-News-Wires/2012/0921/Three-Mile-Island-nuclear-plant-shuts-down-unexpectedly
[21] https://www.sej.org/headlines/summer-raised-questions-how-might-power-plants-fare-warming-world
[22] https://www.sej.org/category/topics-beat/climate-change
[23] https://www.sej.org/category/topics-beat/energy
[24] http://www.eenews.net/public/Greenwire/2012/09/14/1
[25] https://www.sej.org/headlines/japan-zero-out-nuclear-power-2030s
[26] https://www.sej.org/category/region/international
[27] http://ens-newswire.com/2012/09/14/japan-to-zero-out-nuclear-power-by-2030s/
[28] https://www.sej.org/headlines/flood-threat-plants-covered-regulators-nrc-whistleblower
[29] https://www.sej.org/category/topics-beat/journalism/media
[30] http://www.huffingtonpost.com/2012/09/14/flood-threat-nuclear-plants-nrc_n_1885598.html?utm_hp_ref=green
[31] https://www.sej.org/headlines/review-plan-restart-san-onofre-reactor-could-take-months
[32] https://www.sej.org/category/region/national/california
[33] http://www.latimes.com/news/local/la-me-san-onofre-20120913,0,3375576.story
[34] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=76
[35] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=73
[36] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=74
[37] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=75
[38] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=78
[39] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=79
[40] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=80
[41] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=81
[42] https://www.sej.org/category/topics-beat/nuclear-power/radiation?page=137